Home About Solutions Process Projects Contact
+27 62 150 3704 deliannyathi@gmail.com
5–7 Day Average Completion

From Inspection
to Handover

A proven 5‑step operational roadmap designed for zero friction, total transparency, and lasting results. Most residential projects complete in 5–7 business days.

15-Year Guarantee
Zero Deposit
All 9 Provinces
Certified Applicators
24h Quote Turnaround
0yr
Product Guarantee
0h
Quote Turnaround
0
Provinces Served
0%
Pay on Delivery
Inspection
Day 1
2
Quote
24 Hours
3
Delivery
2–4 Days
4
Application
1–3 Days
5
Sign‑off
Final
GGS Application Process

WATCH: See Our Process in Action

COMING SOON

Our Operational Roadmap

Engineered for zero friction and total confidence at every stage.

01
Site Consultation

Free, no‑obligation inspection. We assess surface conditions, measure total area, and identify any prep requirements before quoting.

Free · No Obligation
02
Material Quotation

Detailed, itemised quote within 24 hours. Fixed pricing on materials, labour, and timeline — no surprises on delivery day.

24-Hour Turnaround
03
Order & Delivery

Zero deposit required. Materials delivered within 2–4 business days. You pay only once goods arrive and are verified on site.

2–4 Day Delivery
04
Application

Certified applicators apply Gamazine at a uniform 2–3mm thickness for consistent texture, colour, and long-term durability.

Certified Applicators
05
Quality Sign‑off

Final walkthrough with the client present. Every surface verified against our 15‑year durability standard before we close the project.

15-Year Guarantee

How fast can we start?

Inspection — Usually next business day
Day 1
Quote delivered — After inspection
24 hrs
Materials on site — After confirmation
2–4 days
Application — Size dependent
1–3 days
Final sign-off — Completion day
Same day
Get Your Personal Timeline →
R0
Upfront Deposit
Pay only on material delivery
2–3mm
Coating Thickness
9
Provinces Covered

Quick Material Estimator

Get a rough estimate instantly. An exact, fixed-price quote is always free and delivered within 24 hours of inspection.

Material Cost Estimator

Indicative only · Based on R150–R350/m²

ESTIMATE TOOL

Adjust fields above for a rough estimate. For a firm fixed price, book a free inspection.

Estimated Material Range
Enter area above to calculate
Low Estimate
High Estimate
Get Exact Fixed Quote →

Indicative estimate only. Actual pricing depends on surface condition, location, prep work, and project complexity. A firm quote is issued free within 24 hours of site inspection.

“If it’s not perfect, we don’t leave.”

Every GGS project is backed by our 15‑year guarantee. We stand behind our work — long after the final coat dries. The quality sign-off walkthrough is conducted with the client present, and any surface that does not meet standard is corrected the same day.

Godfrey Nyathi
Godfrey Nyathi
CEO & Founder, Global Gamazine Suppliers
GGS Logo

Pre‑Inspection Checklist

Tick each item as you prepare — takes only a few minutes

GGS OFFICIAL 0 of 7 completed
Your preparation progress0%
Before We Arrive
1
Clear the perimeterMove furniture, plants, and decorations at least 1m away from all exterior walls.
2
Trim vegetationCut back bushes, branches, and climbing plants touching the walls.
3
Secure petsKeep dogs and cats indoors or away from the work area during inspection.
4
Locate water sourceIdentify your outdoor tap or hose connection — we will need water access on application day.
5
Note problem areasCracks, damp patches, or peeling paint — point these out during the inspection walk.
6
Clear parking accessEnsure space near the property for our vehicle and materials delivery.
7
Inform neighbours (optional)A courteous heads-up prevents surprises during application days.
What We’ll Do
  • Surface assessment — examine all exterior walls
  • Moisture testing — check for hidden damp
  • Precise measurements — calculate exact material needs
  • Colour consultation — choose from our signature range
  • Timeline confirmation — set clear expectations
  • Quote delivery — itemised quote within 24 hours
After Inspection
📄 Quote delivered24 hours
📦 Materials on site2–4 days
🎨 Application1–3 days
✅ Final sign-offSame day
Ask on WhatsApp

Tick items as you go · Download or screenshot for reference

What Clients Say About the Process

★★★★★

“The whole process was incredibly smooth. Quote arrived the morning after inspection, materials were on site in three days, and the team finished in two. No deposit stress either.”

SP
Sipho P.
Sandton, Gauteng
★★★★★

“Godfrey’s team did exactly what they said — they didn’t leave until every wall was right. The 15-year guarantee gave us real confidence. Would recommend without hesitation.”

ML
Michelle L.
Bryanston, Gauteng
★★★★★

“I was nervous about paying upfront, but they only asked for payment when the materials actually arrived. That zero-deposit model builds trust from day one.”

TN
Thabo N.
Centurion, Pretoria

Frequently Asked Questions

Everything you need to know before we arrive at your property.

Do I need to pay a deposit before materials are delivered?
No deposit is ever required. You pay only once materials have been delivered and verified on site. This is our commitment to zero financial risk for every client.
How long does the site inspection take?
A typical residential inspection takes 30–60 minutes. We assess surfaces, take precise measurements, and discuss colour preferences. Larger commercial sites may take slightly longer.
What is Gamazine and how does it differ from paint?
Gamazine is a textured acrylic wall coating applied at 2–3mm — far thicker than conventional paint. It is fully waterproof, UV-resistant, and requires no repainting for up to 15 years under normal conditions.
Can Gamazine be applied over existing paint or plaster?
In most cases, yes. Our team assesses adhesion quality during inspection. Where the existing surface is compromised, we include the necessary prep work transparently in your quote.
What if I am not satisfied with the final result?
We do not leave until the project is right. The sign-off walkthrough is conducted with the client present. Any surface that does not meet standard is corrected the same day before we close the project.
Do you operate outside Gauteng?
Yes — GGS operates across all 9 provinces. For projects outside Gauteng, travel and accommodation are discussed upfront and included in your itemised quote with full transparency.
How many colours does Gamazine come in?
Our signature range spans clean whites and warm neutrals to bold contemporary tones. Colour consultation is included in every free site inspection so you can choose with confidence before committing.
Is the 15-year guarantee issued in writing?
Yes. The 15-year durability guarantee is provided in writing at project handover, tied to the specific surfaces coated. It covers peeling, delamination, and structural coating failure under normal use.
FREE · NO OBLIGATION

Ready to start your project?

Book your free site inspection and receive a detailed, itemised quote within 24 hours — zero deposit, zero pressure.

Schedule Free Inspection → WhatsApp Us

+27 62 150 3704 · deliannyathi@gmail.com